Potential Transformers for Smart Grid

The customer is a leading manufacturer of Electrical switch gear including Circuit breakers,critical application in circuit breakers , Electrohms was involved in developing the interposing transformers as per the specifications agreed upon.

challenge

The Challenge

The customer - a global leader in electrical switchgear manufacturing - required   rapid  development of  critical transformers for the application and also  meet  global standards

DesignConstraints

Design Constraints

The customer needed a reliable  supplier developing potential transformers as follows:

  • Low - Phase error, highly linear and accurate
  • Design a   housing for  three phase  application
  • Product to be tested  for reliability and performance
  • Fast development and production program.
solutions

The Solution

ELECTROHMS   developed the prototype in a very short time.

  • Pilot   lots were dispatched for test and approval as per schedule.
  • Good sourcing and coordination between various suppliers was ensured.
  • Production ramp up achieved ahead of schedule by the team formed specifically for this development within ELECTROHMS.

" Electrohms team was excellent in all our requirements and specifications thoroughly and developed prototypes within the time line agreed ."